Triangle Icon

Project Requirements

The works were across three floors in various areas and had to be carefully designed to achieve the optimum lux level based on limited locations where the luminaires could be installed due to the number of steel beams in place.

Back to Case Studies

Project Conclusion

This project was a great success and it was very satisfying seeing the transformation the refurbishment made to the space and to the people that work there.

 

This project even made it into MIX Interior magazine as their feature case study! To read the full article, click here

get in touch about a project today