project requirements

The client asked us to light their stunning contemporary boardroom and smaller meeting rooms.

 

We needed to deliver these within a 6-week timescale and keep as close as possible to the dimensions originally set out by the interior design company.

 

We advised the client to add dimmable controls to give flexibility of function in the rooms – projector presentations are best in darkness, but you still need light for taking notes!

Back to Case Studies

PROJECT CONCLUSION

This project was delivered with time to spare directly to site to ensure completion dates could be achieved.